What an installation can cover
Depending on the system and site, installation may include assembling panels and connectors, mounting work surfaces and storage, and leveling stations to the agreed layout. Reconfiguring existing stations may also be possible. Exactly what is included is confirmed after assessment.
What is excluded
To set expectations clearly:
- No electrical work: hard-wiring panel power to building circuits requires a licensed electrician
- No data or network cabling unless separately arranged with your provider
- Building permits and landlord approvals stay with the tenant or owner
- Missing or incompatible components must be resolved before installation
Preparing the site
Clear the area, confirm the layout is final and coordinate the electrician's visit. Our Hackensack measuring guide covers doors and elevators; the hybrid layout guide covers aisle widths and station counts.
Catalog exampleWant to compare new manufacturer options? Browse the Office Star 2026 catalog and send us the page and model.

